Coopersburg, PA
Master Bathroom Remodel in Coopersburg
“Yamild, Lorenzo, and the entire crew did a wonderful job remodeling our master bathroom! We absolutely love our new shower and the additional closet space they were able to create for us. They listened to our needs, paid attention to what we wanted, and delivered a beautiful finished space. We are so happy with the results and highly recommend Vene Construction!”
See photos and the full story
Coopersburg, PA
Master Bathroom Remodel in Coopersburg
- Cost
- About $26,000Final invoice for labor and materials, including the closets
The project
The homeowners wanted a new shower and more closet space in their master bathroom. Vene Construction had a new layout drawn from the room's measurements and their wish list, and sent the design with the estimate. They liked the plan, said the price was fair, and moved forward. The new layout puts a walk-in shower where the jetted tub sat under the window and turns the old corner shower into his-and-hers closets. The final invoice came to about $26,000 for labor and materials, closets included.
The challenge
The old shower was tucked into a corner, a jetted tub took up the window wall, and the room didn't have the closet space the homeowners wanted. The new shower needed a different spot, which meant moving the supply lines and the drain. That spot had a window on the back wall, so the shower also needed privacy without losing the daylight.
What we did
The crew tore out the jetted tub, the old shower, the toilet, the vanity, and the tile floor, and a plumber moved the supply lines and drain to the other side of the room. One of the homeowners met the crew at the tile store to pick the tile and grout in person, which matters on a shower this size. The new shower has a built-in bench, a pebble mosaic floor, and black-framed glass doors. A company Vene works with added frosted privacy film to the window, so the shower keeps its light and its privacy. The old shower corner became two closets. When the vanity top arrived broken, Vene returned it and got a replacement the next day, so the schedule held. The crew cleaned up at the end of every day.
The result
The homeowners now have a large walk-in shower with a seat and natural light, a new vanity, and closet space they didn't have before. The finished room follows the design they approved before demolition started.
After photos








Before photos































