Vene Construction

Bathroom Remodel in the West End Theatre District, Allentown

West End Theatre District, Allentown, PA

Bathroom Remodeling

Project Story

This West End Theatre District bathroom was taken from an older tub/shower and vanity layout through demo and rebuild into a finished bathroom with a freestanding tub, walk-in shower, large-format marble-look wall tile, built-in niches, mosaic shower floor, gray floor tile, and black fixtures.

Project Type
House · Residential
Primary Service
Bathroom Remodeling
Project Scope

What Changed

  • Bathroom demolition and removal of older tile and finish materials
  • Tub/shower area rebuilt into a freestanding tub and walk-in shower layout
  • Large-format marble-look wall tile across the wet wall areas
  • Built-in shower and tub niche details with mosaic accent tile
  • Mosaic shower floor and gray bathroom floor tile
  • Black shower, tub, and fixture finish details
The Starting Point

What Needed to Change

The bathroom started with older tile, an older tub/shower area, and surrounding wall and floor sections that had to be opened during demo. The before photos show the room mid-tearout, with the old wet-area finishes removed and the bathroom ready for a more complete rebuild.

The Solution

How the Finished Space Came Together

Vene Construction rebuilt the visible bathroom scope with a new freestanding tub, a walk-in shower area, large-format marble-look wall tile, built-in niche details, mosaic shower floor tile, gray floor tile, black fixtures, and final finish work around the tub, shower, vanity, window, and wall transitions.

The Finished Result

The finished bathroom now reads as one planned room instead of a patched older bath: the freestanding tub, walk-in shower, tile walls, shower niches, gray floor tile, and black fixtures all work together in a cleaner modern layout.

Materials and finishes: Large-format marble-look wall tile, Mosaic shower floor tile, Mosaic niche accent tile, Gray bathroom floor tile, Freestanding bathtub, Black shower fixtures, Black tub fixture, Black window and trim accents, Recessed ceiling lighting

Project Photos

Before and During Photos

BeforeBefore the remodel: the older tub and shower area opened up during demo, with the existing tile and surrounding wall areas being removed.
DuringDuring the project: bathroom floor, wall, and fixture areas opened for the rebuild before the new tile and finish work went in.
DuringDuring the project: vanity-side wall and floor areas exposed as the old bathroom finishes were cleared out.

Have a Similar Project?

Planning something similar? Vene Construction can walk the project with you, explain the scope, and put together a clear estimate.