Full House Renovation in Slatington

Slatington, PA

Whole-Home Renovations

Project Story

This Slatington house renovation covered multiple levels: attic framing, new drywall, painting, and flooring; second-floor flooring and painting; and basement framing, drywall, painting, and tile installation. The photo set shows the project moving from rough attic and basement conditions into finished rooms, painted walls, white trim, recessed lighting, wood-look flooring, and gray basement tile.

Project Type
House · Residential
Primary Service
Whole-Home Renovations
Project Scope

What Changed

  • Attic framing and finish work under the existing rafters
  • New drywall and paint in the attic and basement areas
  • Second-floor painting across rooms, hallway, and stair areas
  • Wood-look flooring visible across the renovated second-floor spaces
  • Basement wall framing before drywall and finish work
  • Basement drywall finishing, painting, trim, and recessed lighting
  • Gray basement tile flooring installation
The Starting Point

What Needed to Change

The house needed finish work across several levels, not a single-room update. The before and during photos show a rough attic, second-floor rooms with older finishes, an exposed stair area, and a basement that still needed framing, drywall, paint, and a finished floor.

The Solution

How the Finished Space Came Together

Vene Construction completed a multi-level renovation scope: attic framing, drywall, painting, and flooring; second-floor painting and flooring; stair-area finish work; and basement framing, drywall finishing, painting, trim, recessed lighting, and tile floor installation.

The Finished Result

The finished house now has usable, cleaner interior spaces across the second floor and basement. Light wall paint, white trim, recessed lighting, wood-look flooring upstairs, and gray tile in the basement give the renovation a more complete and consistent finish.

Materials and finishes: Wood framing visible in attic and basement areas, New drywall and finished joint compound, Light interior wall paint, White trim and baseboards, Recessed ceiling lights, Wood-look flooring visible on the second floor, Gray basement tile flooring, Existing attic rafters and masonry conditions retained where visible

Project Photos

Before and During Photos

BeforeBefore the attic work: open rafter area and rough attic conditions before new framing, drywall, flooring, and paint were completed.
BeforeBefore the second-floor finish work: patched walls, older painted surfaces, and exposed wood flooring before the room was refinished.
BeforeBefore the basement finish work: open basement area before the new framing, drywall, paint, and tile floor were completed.
DuringDuring the attic work: new framing and knee-wall layout underway beneath the existing rafters.
DuringDuring the second-floor work: room opened for flooring, wall finish, and paint preparation.
DuringDuring the stair work: exposed brick and stair area before the finished wall and stair surfaces were completed.
DuringDuring the stair work: painted side wall and raw stair treads before the stair area was fully finished.
DuringDuring the basement work: wall framing underway before drywall, paint, and tile installation.
DuringDuring the basement work: drywall hung and finishing underway before paint and floor tile.